Cypress CY62158EV30 Manual de usuario Pagina 42

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 81
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 41
42 September 5, 2010
3. On the DK-LM3S9B96 board remove the shunt jumpers on JP16-JP31 and the JP39 headers
as shown in Figure E-1 on page 41.
Figure E-2. Removing EPI Board from DK-LM3S9B96 Development Board
4. Install the two snap-in nylon standoffs on mounting holes above the EPI connector J2.
5. Place the expansion board on top of the DK-LM3S9B96 board and align the standoffs, the EPI
connector, and the 2x17 J2 header.
6. Press firmly downward until the board snaps in, then verify that the board is firmly seated on
the EPI connector, the 2x17 header, and the standoffs.
7. When powering up the board, verify that the power indicator LED D1 is lit.
Remove board
Remove jumpers
Vista de pagina 41
1 2 ... 37 38 39 40 41 42 43 44 45 46 47 ... 80 81

Comentarios a estos manuales

Sin comentarios